D4 Major Project Updates

6/19/2025 - 10:50am-11:45am

The presentation discusses 4 major projects in D4. Jupiter Federal Bridge replacement project replaces a twin double leaf bascule bridge using Smart Work Zone & “Coffee with the project team”. SRA1A Drainage Pumps – Hollywood, Fl adds resiliency by installing pumps and seawall partnering with local stakeholders. SW 10th St. Connector Phased Design-Build highlights alternative project delivery of a regional connection in Broward County. MR-MICCI project double-tracks the southernmost 1.25 miles of the 72.6 miles long rail corridor serving the tri-county.

Instructor(s):

Bing Wang (D4)
Binod Basnet (D4)
Brad Salisbury (D4)
Robert Bostian (D4)

Presentation(s):